How to coordinate product-launch content in six weeks
Usage example
A six-week scenario for coordinating messaging, demos, landing pages, email, social content, approvals, and launch deliverables.

Illustrative example.
A small team is preparing a launch with a fixed date. It needs to gather available material, identify gaps and agree on what to deliver for each channel. The product launch plan puts the phases, pieces, and dates of the before, during, and after on one page.
A startup plans to release a feature on 15 October. Product screens are still changing, legal must review claims, and the demo requires a stable build. Marketing needs a landing page, video, email, documentation, ads, and social content.
The deadline does not make everything equally urgent.
Define the minimum launch
Separate:
- Required: landing page, approved message, stable demo, basic documentation, and customer email.
- Important but movable: long video, case study, webinar, or complete paid campaign.
- After launch: adaptations, behind-the-scenes material, and derived education.
When a critical dependency slips, protect the minimum rather than demanding overtime for everything.
Give every decision an owner
| Decision | Owner |
|---|---|
| Product scope | Product lead |
| Claim and proposition | Marketing with legal approval |
| Stable demo | Product |
| Commercial message | Marketing |
| Release date | Leadership |
| Channel publication | Content owner |
Reviewers can contribute. One person closes each decision.
Six-week schedule
Week 1: scope and message
Freeze what launches, define the audience and promise, inventory material, name approvers, and list minimum deliverables.
Week 2: structure
Create the landing wireframe, demo script, email/video/social briefs, tracking plan, and sensitive-claim list.
Week 3: first production
Draft landing copy, internal demo, first creative assets, documentation, and message review before polishing.
Week 4: integration and review
Build the staging page, rough cut, emails, core adaptations, and legal review of facts and terms.
Week 5: quality control
Match product to screenshots and copy, test links and forms, identify final versions, prepare support responses, and make a go/no-go decision.
Week 6: publication and response
Schedule approved work, confirm channel owners, record incidents, preserve published versions, and prepare controlled corrections.
Handle product changes
When a screen changes, do not request “update everything.” Locate the landing, demo, thumbnail, article, email, and ad assets containing it.
Connecting assets to the feature makes impact visible before accepting the change.
Use a real go/no-go gate
Two days before release, verify availability, claims, price, landing page, tracking, support preparation, incident ownership, and approval of critical assets.
When something fails, choose what to remove, correct, or delay. “We will see tomorrow” is not a decision.
Measure without inventing success
Record traffic, activation, leads, errors, support questions, asset performance, production time, and late changes.
Compare against objectives defined before release. Shipping on time is not success when nobody uses the feature. The campaign analysis template gathers results, learnings, and next steps.
Frequently asked questions
What is a product launch?
A product launch is the moment a company makes a product available to the public along with coordinated communication: a page, a demo, email, social media, press, or ads. It includes the preparation beforehand, the release on a specific date, and the follow-up in the first few weeks.
How far in advance should you prepare launch content?
It depends on the number of pieces and the dependencies, especially when the product will be stable and how long legal review takes. For a launch with a landing page, demo, email, and social, six weeks is a reasonable runway; with less time, cut whatever isn't essential for launch day.
What's the difference between a soft launch and a full launch?
A soft launch is a quiet, limited release, to a group of customers, in one country, or without a campaign, to catch problems before announcing it to everyone. The full launch comes later, with all the communication. It's useful when the product may still change.
When a product screen changes
If product changes a screen, check which videos, screenshots, ads, or emails show the previous version. Candidate searches and publication records help organize that review.
Polimake lets you store, search, and retrieve images and videos through its interface, API, or MCP, including search by frame content. Play candidate videos to check the screen and its context. An assistant can retrieve that material and work with your connected creation or editing tools.
Upload the launch material to your media library and find candidates with natural-language search.
Start with your own archive
Create an account and try this workflow with your own photos, videos and past work.